Normal view
MARC view
- time taken to repair damaged infrastructure
Entry Topical Term
001 - CONTROL NUMBER
- control field: 14797
003 - CONTROL NUMBER IDENTIFIER
- control field: KeNa-CAJ
005 - DATE AND TIME OF LATEST TRANSACTION
- control field: 20231106112004.0
008 - FIXED-LENGTH DATA ELEMENTS
- fixed length control field: 231106|| aca||aabn | a|a d
040 ## - CATALOGING SOURCE
- Original cataloging agency: KeNa-CAJ
- Transcribing agency: KeNa-CAJ
150 ## - HEADING--TOPICAL TERM
- Topical term or geographic name entry element: time taken to repair damaged infrastructure
670 ## - SOURCE DATA FOUND
- Source citation: Work cat.: (KeNa-CAJ)2132: Njogu Humphrey 14786, Effects of drought and floods on infrastructure in Kenya , 2020.